This is a house that had a new deck installed in Leduc, AB. The contractor drilled a pilling through the sewer then filled the pilling with concrete. When the concrete was poured it flowed down the sewer for about 30 feet. Have your sewer located when all the other utilities are located.
sewer, drain, plumbing, septic systems, septic tanks, root cutting, high pressure jetting, mobile pressure washing, plumbing repairs, preventive maintaince. excavations